The Heavy Responsibility Is At Hand- The Libyan Evacuation Operation

The heavy responsibility is at hand- the Libyan evacuation operation

SHACMAN

In 2008, Libya launched its first railway engineering project. The project was undertaken by China Railway Construction and used a total of about 1,000 heavy trucks from SHACMAN.

When the civil war broke out in Libya in 2011, more than 30,000 local Chinese and overseas Chinese and personnel of Chinese-funded institutions were in extreme danger. The Chinese government urgently used human and material resources to evacuate these personnel. In order to quickly and safely evacuate these personnel, a batch of SHACMAN dump trucks that have just been unloaded for a few days became the only way for them to evacuate to the border. SHACMAN dump trucks have thick side are safe and reliable, can block bullets, which became a barrier for the lives of the people inside.

SHACMAN believes that only by maximizing the reliability of the products can we shoulder the heavy responsibilities in critical moments.

SHACMAN project